Busan - Geoje Fixed Link, South Korea
Print
The total length of tunnel will be approximately 4km, with 270m portals connecting the tunnel to the bridge section and Geoje Island. The tunnels are to be designed for two-lane traffic with emergency / crawler lane hard shoulder.