Environmental mitigation measures were required after some of the construction work and were carried out by JMT.
-
The Dauphin Relief Road was constructed in two sections, with all four lanes... -
Removing the old concrete and bituminous pavement for the reconstruction of... -
Excavating and hammering rock at the Mt. Pleasant Road intersection with old... -
The road at Dauphin has relieved a major bottleneck in the Harrisburg area of... -
Work on the relief road was started in June 1998 and was fully completed by... -
The Dauphin project required the design and construction of a number of walls... -
Environmental mitigation measures were required after some of the...