The motorway provides an improved link between the north and south of Poland from the Baltic ports of Gdańsk and Gdynia across the country to Vienna, Austria, and then through Slovenia to meet the Mediterranean and the Adriatic.
-
The motorway provides an improved link between the north and south of Poland... -
The construction of the Polish section of the A1 was completed in two phases.... -
The total cost of the project was €1.4bn. The finance was raised by the GTC... -
The motorway is a dual carriageway with two lanes in each direction and an... -
The road is a public-private partnership (PPP) arrangement between the GTC... -
The construction of phase one required earth works amounting to the movement...