The twin tunnels were mainly cut using a TBM.
-
The Herren Tunnel is a road tunnel in Lübeck opened in August 2005. -
The Herren Tunnel replaces the ageing bridge over the Trave River. -
The tunnel was sealed by lining it with 3,640 prefabricated concrete... -
The twin tunnels were mainly cut using a TBM. -
The TBM being assembled in the access shaft. -
Excavation for one of the ramps to lead to the tunnel entrance. -
Components of the TBM being transported for assembly. -
The interior of the tunnel before the road surface was laid. -
The entrance of the finished Herren Tunnel. -
Herren Tunnel toll booths.