The new bridge was designed to carry 127,000 vehicles per day by 2011, but was carrying over 163,000 vehicles per day in 2001.
-
Aeriel view of the Krungthep Bridge project. -
Cross section of the piers and piles. -
Cutting of pileheads. -
Plan view and section of river pile heads. -
An aeriel view of the Krungthrep Bridge construction. -
Advance Shoring System in Bangkok over Rama III Road. -
Elevation of the Krungthep bridge. -
The new bridge was designed to carry 127,000 vehicles per day by 2011, but... -
The new bridge at night.