Otay River Bridge.
-
Final focus map of the route. -
Otay River Bridge. -
Paving underway on one of the road sections. Paving began in summer 2006. -
The toll plaza on the new road, which will use the FasTrak system. -
A map of the route showing the surrounding road network. -
Another of the road bridges on the route being constructed. -
The toll plaza under construction in autumn 2006.