The particular challenge that faces the construction of this tunnel is the soft clay that has to be bored through.
-
The two twin-tunnels of the Westerschelde Tunnel run 12m apart and have two... -
With an estimated cost of €726m, the Westerschelde Tunnel will provide a... -
The Westerschelde tunnel boring machines (TBM) worked for 24 hours a day, six... -
Inside the 8m cylinder hydro shield under the Westerschelde. -
One of the 53,000 concrete lining segments being put in place. -
The particular challenge that faces the construction of this tunnel is the...