Westerschelde Tunnel, Netherlands

 
key facts
Key Data
Subcontractors/suppliers
Herrenknecht, Ceresola, Deutz AG, ROWA, Tunneling Logistics, SCHAEFF, Ensaco, Schöma
Cost
€726 million
Tunnel length
6.6km each way
Capacity
27,000 vehicles/day
Lanes
2 x 3.5m each
Clear diameter
10.10m

The Dutch Province Zeeuwsch-Vlaandren is cut off from the other parts of the Netherlands by the Westerschelde port entrance to Antwerpen. Projects for a permanent road connection have been made since the 1930s. The solution to this is the Westerschelde Tunnel: an undersea highway tunnel, 6.6km long, consisting of two tunnel tubes, each with two lanes (3.5m each), with 26 cross passages every 250m. The Westerschelde Tunnel will provide a faster and more economical route for around 27,000 vehicles a day between Ellewoutsdijk in Zuid-Beveland and the Zeeuws Vlaanderen region near Terneuzen. KMW (Kombinatie Middelplaat Westerschelde v.o.f consisting of Philipp Holzmann, Wayss & Freitag, Franki, BAM Infrabouw, Heijmans and Voormolen) have been awarded the contract for the design, construction and maintenance for the tunnel for the first ten years of operation, by NV Westerschelde Tunnel. It is costing €726 million and the project is expected to reach completion in early 2003.

TUNNEL STRUCTURE

The Westerschelde Tunnel consists of two lanes (3.5m width in each direction) including safety areas. The fire protection sheathing and constructional tolerances make a clear diameter of 10.1m. A segment thickness of 45cm and annular gap grouting of 16.5cm make the TBM's outer diameter 11.33m. The total length of the tunnel is 6.6km per tube with 26 cross passages run every 250m connecting both tubes. The passages have a cross section of 2.5m x 2.7m, a length of 12m and a clear width through the passage doors of 1.5m. The cross passages are vital to the safety of the Westerschelde Tunnel.

TUNNEL OUTFIT

An inspectable service channel below the roadway houses all the wiring for the tunnel outfit, such as air control, signalling, supplies and the safety and communication system. Each cross passage has an underground floor that accommodates electrical distribution boxes. Additional drainage appliances are found at the tunnel bottoms. The fire protection sheathing of the tunnel is designed for a fire-load of 1,350ºC, according to the Rijkswaterstaat specification.

CROSS PASSAGES

26 cross passages running every 250m are built using ground freezing methods. A frosted 'body' of 2m thickness is produced around each cross passage by drilling 22 holes for freezing. Special investigations have been made into the influence of salt content of the groundwater and the behaviour of the Boomse clay during freezing as well as the changes of its geological features after thaw. The container size refrigerating plants are positioned inside the tunnel directly beside the cross passages. Calcium chloride solution, applied with a temperature of -37°C is refrigerating medium. The 'bodies' take about 30 to 45 days to freeze, depending on ground conditions.

TUNNEL BORING MACHINES

The particular challenge that faces the construction of the Westerschelde Tunnel is the soft clay that has to be bored through. The more sticky, highly-plastified Boomse clay poses geological problems. With the bulk of the tunnel running at up to 60m below sea level, engineers have to design TBMs (tunnel boring machines) comprising of three basic units. They work by boring a whole cross-section of tunnel tube at a forward speed of 12m per day and per tube. Two Mixshields (11.3m in diameter) provided by Herrenknecht AG, start from an artificial polder at Terneuzen and bore through to 20m deep concrete caissons at Ellewoutsdijk. 'Sara', is the name of the machine boring the east tube, and 'Suzanna' the west. The two tunnels are the deepest ever to be driven worldwide and are the greatest challenge to date in terms of machine layout, processing and construction. An open spoke-type cutting wheel with rim, an active centre cutter with own flushing circuit, agitators and a rolling crusher in front of the suction pipe enable optimum material transport.

CONSTRUCTION MANAGEMENT

Both tunnel tubes have a concrete lining of 53,000 segments which are placed in position by the boring machine after boring. Local roads are not able to cope with the huge amount of material transport, therefore all major items are supplied via ship and handled at an own landing facility. The production of the 53,000 concrete segments takes place in a twin plant on site. All material going into the tunnel is transported exclusively by rail. Eight Schöma locomotives and 80 wagons operate out of the logistics centre in Terneuzen and are responsible for the transport of the people and materials needed for the construction of the tunnel. There is about 275,000t of concrete to be transported in all. Some of the 1,600,000m³ of spoil produced by the tunnelling is being used for the concrete, with the remainder being dumped off-site.

A TUNNEL FOR LIFE?

The Westerschelde Tunnel is the first engineering structure in the world to be designed in a fundamentally correct way on the basis of a designed service life - in this case, 100 years. The intended functions and required reliability are defined and it is then determined which functions would be adversely affected by concrete deterioration. The structural design models can then account for the expected erosion. The tunnel, once finished will be a 6.6km long undersea highway tunnel, running at up to 60m below sea level making it the deepest ever worldwide. Two tunnels, each 10.10m wide will run alongside each other providing northbound and southbound traffic routes that connect the Zeeuwsch-Vlaanderen province to Ellewoutsdijk in Zuid-Beveland, for around 27,000 vehicles per day.



Expand Image Expand Image
The two twin-tunnels of the Westerschelde Tunnel run 12m apart and have two 3.5m wide lanes for traffic each. All images courtesy of NV Westerschelde Tunnel.



Expand Image Expand Image
With an estimated cost of €726 million, the Westerschelde Tunnel will provide a faster and more economical route for around 27,000 vehicles a day between Ellewoutsdijk in Zuid-Beveland and the Zeeuws Vlaanderen region near Terneuzen.



Expand Image Expand Image
The Westerschelde tunnel boring machines (TBM) worked for 24 hours a day, six days a week to meet construction targets.



Expand Image Expand Image
Inside the 8m cylinder hydro shield under the Westerschelde.



Expand Image Expand Image
One of the 53,000 concrete lining segments being put in place.



Expand Image Expand Image
The particular challenge that faces the construction of this tunnel is the soft clay that has to be bored through.



Expand Image Expand Image
The fire protection sheathing of the tunnel is designed for a fire-load of 1,350ºC.



Expand Image Expand Image
The two tunnels are the deepest ever to be driven worldwide and are the greatest challenge to date in terms of machine layout, processing and construction.


Post to:
Delicious  
Digg  
reddit  
Facebook  
StumbleUpon  


Home
New On This Site
Products & Services
Company A-Z
Industry Projects
Features
White Papers
Jobs & Careers
Press Releases
Events & Exhibitions
Newsletter
Advertise With Us
About Us
Client Area

The website for the road traffic industry