The twin tunnels have allowed a nature reserve to be preserved.
-
ConnectEast will run the road over a concession period of 39 years. -
One of the 17 interchanges involved in the project. -
The road project has involved 103 structures. -
There are 39km of road which bypass 45 sets of traffic lights. -
The twin tunnels have allowed a nature reserve to be preserved.